Stormwater Management

Construction Site - Stormwater Runoff Control

This Minimum Control Measure emphasizes the reduction or elimination of pollutants to the municipal separate storm sewer system that may emanate from construction sites.


Regulated MS4s (with land use control capabilities) are encouraged to address this type of pollution through adoption or amendment of a local law or other regulatory mechanism. MS4s without land use control capabilities are encouraged to develop necessary policies and procedures, and include such requirements in lease agreements, bid specifications, contracts, and/or permits.


Other program elements required as part of this minimum control measure include enforcement procedures and actions to ensure compliance; requirements for construction site operators to implement appropriate erosion and sediment control BMPs; requirements for construction site operators to control waste at the construction site such as discarded building materials, truck washout, chemicals, litter and sanitary waste; procedures for plan review which incorporate the consideration of potential water quality impacts; procedures for receipt and consideration of information submitted by the public; and procedures for site inspection and enforcement of control measures.


In addition to the stormwater requirements that MS4s place on construction activities, the construction site operators must also apply for permit coverage directly from the State. A description of these requirements is included within the SPDES General Permit for Stormwater Discharges from Construction Activity.


Under the SPDES General Permit for Stormwater Discharges from Construction Activity, construction site operators must notify the state of any project disturbing one acre or more, prepare a formal written Stormwater Pollution Prevention Plan (SWPPP) and adhere to the provisions of the plan during and after construction. The SWPPP generally describes the erosion and sediment control practices and, where required, post-construction stormwater management practices that will be implemented to reduce the pollutants in stormwater discharges. The erosion and sediment control practices used are generally designed in conformance with the technical standards specified in the New York Standards and Specifications for Erosion and Sediment Control and the NYS Stormwater Management Design Manual. It should be noted that the Stormwater Pollution Prevention Plan (SWPPP) required of construction site operators is different than the Stormwater Management Program Plan (SWMP) required of regulated MS4s.

Selected Activities and BMPs:

To meet the Construction Site - Stormwater Management Control requirements, the MS4 has selected the following Best Management Practices (BMP's) and activities to ensure the reduction of all pollutants of concern in stormwater discharges to the maximum extent practicable.


Construction Site - Stormwater Runoff Control Law or Ordinance

Description of BMP/Activity:
Draft and adopt a local stormwater law, ordinance or other regulatory mechanism to establish minimum construction site stormwater management requirements. The mechanism must provide equivalent protection to the NYS SPDES General Permit for Stormwater Discharges from Construction Activities and must be certified as such. This activity may also relate to, or be part of, the discussion of other activities and BMPs indentified below such as: the inclusion of: erosion and sediment controls; enforcement procedures; construction site waste management; procedures for SWPP plan review; procedures for receipt and consideration of information submitted by the public; procedures for site inspection, enforcement and sanctions.
Staff, Agency, and/or Organization Reponsible for Completing this Activity:
Frequency of Activity:
  • Program Development: Single Occurrence (Includes Updates As Needed)
  • Implementation: Single Occurrence (Includes Updates As Needed)
Status - Program Development:
[X] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[ ] On-Going - This activity will be undertaken throughout all years of the permit.
Status - Implementation:
[ ] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[X] On-Going - This activity will be undertaken throughout all years of the permit.

Erosion and Sediment Control Program

Description of BMP/Activity:
Develop a program that requires operators to implement specific management practices to control erosion and sediment on regulated construction sites. These practices must meet the State's most up-to-date technical standards and are generally referenced in the New York Standards and Specifications for Erosion and Sediment Control and the NYS Stormwater Management Design Manual. This program activity may be included as part of the local law, ordinance or other regulatory mechanism
Staff, Agency, and/or Organization Reponsible for Completing this Activity:
Frequency of Activity:
  • Program Development: As Needed
  • Implementation: As Needed
Status - Program Development:
[X] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[ ] On-Going - This activity will be undertaken throughout all years of the permit.
Status - Implementation:
[ ] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[X] On-Going - This activity will be undertaken throughout all years of the permit.

Requirement for Stormwater Pollution Prevention Plans (SWPPPs)

Description of BMP/Activity:
Develop a program that requires construction site operators to prepare and submit Stormwater Pollution Prevention Plans to the MS4. The required content for SWPPPs is specified in the NYS SPDES General Permit for Stormwater Discharges from Construction Activities. This program activity may be included as part of the local law, ordinance or other regulatory mechanism
Staff, Agency, and/or Organization Reponsible for Completing this Activity:
Frequency of Activity:
  • Program Development: As Needed
  • Implementation: As Needed
Status - Program Development:
[X] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[ ] On-Going - This activity will be undertaken throughout all years of the permit.
Status - Implementation:
[ ] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[X] On-Going - This activity will be undertaken throughout all years of the permit.

Construction Site Inspection Program

Description of BMP/Activity:
Develop and implement a program that allows the MS4 to conduct site inspection of construction sites and any related erosion and sediment control measures. The program describes inspection procedures and may also include procedures for tracking inspections and methods to identify priority sites for inspection.
Staff, Agency, and/or Organization Reponsible for Completing this Activity:
Frequency of Activity:
  • Program Development: As Needed
  • Implementation: As Needed
Status - Program Development:
[X] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[ ] On-Going - This activity will be undertaken throughout all years of the permit.
Status - Implementation:
[ ] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[X] On-Going - This activity will be undertaken throughout all years of the permit.

Assurance of Contractor Certification

Description of BMP/Activity:
Develop a local program to insure that construction site operators conducting work within the MS4's jurisdiction have received appropriate State sanctioned erosion and sediment control training and certification. The MS4 is not required to provide the training but may co-sponsor training workshops with other agencies qualified to conduct such training
Staff, Agency, and/or Organization Reponsible for Completing this Activity:
Frequency of Activity:
  • Program Development: As Needed
  • Implementation: As Needed
Status - Program Development:
[X] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[ ] On-Going - This activity will be undertaken throughout all years of the permit.
Status - Implementation:
[ ] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[X] On-Going - This activity will be undertaken throughout all years of the permit.

Construction Site - Stormwater Management Library

Description of BMP/Activity:
Obtain and review copies of relevant documents, guidance and manuals such as the New York Standards and Specifications for Erosion and Sediment Control, the NYS Stormwater Management Design Manual and the NYS Construction Stormwater Inspection Manual.
Staff, Agency, and/or Organization Reponsible for Completing this Activity:
Frequency of Activity:
  • Program Development: Annually
  • Implementation: Annually
Status - Program Development:
[X] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[ ] On-Going - This activity will be undertaken throughout all years of the permit.
Status - Implementation:
[ ] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[X] On-Going - This activity will be undertaken throughout all years of the permit.

Administration of Construction Site - Stormwater Runoff Control Programs and Policy

Description of BMP/Activity:
Establish Construction Site - Stormwater Runoff Control program responsibility, communication, coordination and authority within local departments and agencies. Evaluate existing capabilities, identify needs and designate key staff and their roles in the program.
Staff, Agency, and/or Organization Reponsible for Completing this Activity:
Frequency of Activity:
  • Program Development: Single Occurrence (Includes Updates As Needed)
  • Implementation: Single Occurrence (Includes Updates As Needed)
Status - Program Development:
[X] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[ ] On-Going - This activity will be undertaken throughout all years of the permit.
Status - Implementation:
[ ] Completed - This activity has been completed
[ ] Short-Term - This activity will be accomplished within the current reporting year.
[ ] Long-Term - This activity will be accomplished within the 3 to 5 year permit cycle.
[X] On-Going - This activity will be undertaken throughout all years of the permit.

Measurable Goals:

Regulated communities are required to collect and report information about the development and implementation of their stormwater program. Specific information that the MS4 is required to collect is generally included in the Annual Report and may also be reflected in related Self-Assessments (as applicable). MS4s are also required to identify "Measurable Goals" that will help them evaluate accomplishments and progress over time. The following "Measurable Goals" have been specifically identified for this Minimum Control Measure:

  • Number of SWPPPs reviewed - None needed for review
  • Number of construction sites authorized for disturbances greater than or equal to 1 acre - 0
  • Percent of relevant employees trained - 100%
Program Accomplishments:

Activities and BMPs that have been accomplished to date for this Minimum Control Measure are included within the required MS4 Stormwater Annual Report form and Municipal Compliance Certification. Copies of these documents can be found at the following link (Annual Reports). Copies of various documents and specific products relating to this minimum control measure are included under "Related Documents".


A summary of the effectiveness of this program, associated BMPs, activities and an assessment of measurable goals can be found under the heading "Program Reporting and Effectiveness".

Other Related Documents:
       
© 2025 Village Of Whitesboro, Oneida County
Website Contact: Rebecca Clinch
Email:
10 Moseley Street
Whitesboro, NY 13492
Phone: (315) 736-1613
Fax: (315)736-1677
Printed On May 10, 2025